← Articles · Nov 2026

V-die vs U-die bending force: how the equations compare

The force needed to bend a sheet depends on the tool as much as on the material. A V-die supports the sheet on two shoulders and the punch pushes at the middle; a U-die forms both legs of a channel against the punch, usually with a pad under the bottom. Different books give different equations for each case. This article puts them side by side: what each one assumes, where they agree and where they do not.

Scope: peak force estimates only. Springback, blank length and bend radius limits are not covered. To estimate the V-die air bending force from your own inputs, use the bending force calculator.

V-die air bending: variables of the force equationEstimate of the peak force before bottomingV-dieSheetPunchFWtLF = k · UTS · L · t² / WF punch forceW die opening (width)t sheet thicknessL bend length (into the page)UTS ultimate tensile strengthk die coefficient (≈1.2–1.5, depends on W/t)Units: F in N · UTS in MPa · L, t, W in mm
Figure 1. Variables of the force equation in V-die air bending.

Calculate the force with your own data →

The equations side by side

CaseEquationVariables and conditionsSource
V-die (empirical)F = Kbf·TS·w·t²/DKbf = 1.33 for V-bending. F in N with TS in MPa and w, t, D in mm. Based on simple beam theory.Groover, Eq. 20.8
V-die (empirical)L = l·t²·k·S/sUS units: L in tonf, l and t in in., S in tsi, s = die opening in in. k goes from 1.2 (s = 16t) to 1.33 (s = 8t). 90° bends, no bottoming.ASM Handbook 14B, Eq. 1
V-die (empirical)Fb = 1.2·b·s²·Rm/dwN, mm, N/mm². dw = 5·ri (7·ri at the minimum radius).Tschaetsch, 16.7.1
V-die, air bending (moment-based)F = 4M / [lk − 2(Rk + Rt + T)·sin(φ/2)] · cos²(φ/2)M = bending moment (M = n·UTS·b·T²/4, with n = 1.6 to 1.8, Eq. 5.6a); lk = die opening; φ = bend angle; Rk = die radius; Rt = punch radius; T = thickness.Boljanovic, Eq. 5.9
V-die, bottomingFbbot = n·Fbn = 2 for ri/s ≥ 0.7, 2.5 at 0.5 and 3.5 at 0.35.Tschaetsch, p. 200
V-die, bottomingF1 = 2·p·b·c·cos(φ/2)Extra force for the final reinforcement of the bend. p = specific pressure (Table 5.1), b = width, c = length of the straight end.Boljanovic, Eq. 5.9a
U-die, no padFb = 0.4·s·b·RmWithout a backing pad the bottom bulges.Tschaetsch, 16.7.2
U-die, with padFbT = 0.5·s·w·RmTotal force, about 1.25·Fb. Pad force FPP = 0.25·Fb.Tschaetsch, 16.7.3
U-die (moment-based)F = (2M/l)·(1 + sin φ), l = Ri + Rk + TSame M as above. With an ejector the force must increase by about 30%.Boljanovic, Eq. 5.7, 5.7a
U-die, planished bottomF = p·Ap = specific pressure (Table 5.1), A = area of the bottom.Boljanovic, Eq. 5.7b

Variable names and units follow each source and are not harmonized: the same quantity appears as t, s or T for thickness and as b or w for width. TS, S, Rm and UTS are all the tensile strength.

What they have in common

Where they differ

Worked example

The part comes from Tschaetsch’s own example (Section 16.11): thickness s = 2 mm, width b = 35 mm, tensile strength Rm = 400 N/mm², bend radius ri = 10 mm, so the die width is dw = 5·ri = 50 mm. All values below use Tschaetsch’s equations only, so every number traces to one source.

CaseEquation usedForce
V-die (before bottoming)1.2·35·2²·400/501,344 N (the result printed in the book)
V-die, bottoming (n = 2)2 × 1,3442,688 N
U-die, no pad0.4·2·35·40011,200 N
U-die, with pad (total)0.5·2·35·40014,000 N (pad force 0.25 × 11,200 = 2,800 N)

The V-die value is the one printed in the book. The other three are our own arithmetic with the book’s equations. Dividing the book’s two equations gives FU/FV = dw/(3·s), which is 8.3 here. That ratio is our derivation, not a statement from the book.

The U-die force is much larger than the V-die force because the two equations describe different situations: the V-die value is bending over a wide opening (here 25 times the thickness) before bottoming, and the U-die value is the force to form a channel against the die. The empirical coefficient also matters: with k = 1.33 (Groover) the same V-die case gives 1,490 N, and with k = 1.5 it gives 1,680 N. Note that a die opening of 25t is wider than the 8t to 16t range for which the ASM Handbook gives k, so the V-die value is less certain than the others.

Limits

Sources

Last reviewed: November 2026.